中文
Home / Patents / Brazil

KEY ACCOUNT PRICING · USD

Brazil Utility model

Application, grant and maintenance fees are shown by pricing condition.

Brazil flag

Patent fee details

All applicable entity pricing is displayed side by side.

Application stage

Fees incurred during filing and examination

ItemRequired / optionalCompany applicantIndividual applicantNotes
FeeFee
filing, publication and examination feesRequired1,140 USD1,020 USD
?

Company applicantServices are billed by stage; this filing-stage charge excludes application drafting and translation.

Individual applicantServices are billed by stage; this filing-stage charge excludes application drafting and translation.

Excess-claim fee for each claim over 10Optional75 USD75 USD—
priority claim fee (if required)Optional120 USD120 USD
?

Company applicantNo additional service fee is normally charged for claiming priority with a DAS code. If the authority cannot retrieve the priority data, an electronic copy of the certified priority document must be submitted and translated by us for filing with the patent office. This fee applies when priority is claimed using the priority document.

Individual applicantNo additional service fee is normally charged for claiming priority with a DAS code. If the authority cannot retrieve the priority data, an electronic copy of the certified priority document must be submitted and translated by us for filing with the patent office. This fee applies when priority is claimed using the priority document.

document drafting (if required) (starting from)Optional300 USD300 USD
?

Company applicantFees vary according to the technical field and drafting-quality requirements.

Individual applicantFees vary according to the technical field and drafting-quality requirements.

translation fee (per 1,000 Chinese characters) — Chinese-to-PortugueseOptional83 USD83 USD
?

Company applicantCalculated by the word count in the Word document.

Individual applicantCalculated by the word count in the Word document.

translation fee (per 1,000 Chinese characters) — English-to-PortugueseOptional120 USD120 USD
?

Company applicantCalculated by the word count in the Word document.

Individual applicantCalculated by the word count in the Word document.

response to an office action (if required) (starting fee, per instance)Optional375 USD375 USD
?

Company applicantCharged according to complexity and the number of office actions.

Individual applicantCharged according to complexity and the number of office actions.

Grant stage

Fees incurred at grant and certificate issuance

ItemRequired / optionalCompany applicantIndividual applicantNotes
FeeFee
grant/certificate feeRequired525 USD525 USD
?

Company applicantIncludes annuities for the first two years.

Individual applicantIncludes annuities for the first two years.

Patent annuity fees

Annual maintenance fees are maintained independently by country and patent type.

Year / itemRequired / optionalStandard feesReduced feesNotes
Official fee (original)Service fee (USD)TotalOfficial fee (original)Service fee (USD)Total
Year 3 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 4 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 5 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 6 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 7 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 8 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 9 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 10 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 11 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 12 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 13 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 14 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 15 · Pre-grant maintenance feeRequired240 BRL234 USD277 USD120 BRL234 USD255 USD
?

Standard feesPre-grant: maintenance fee(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPre-grant: maintenance fee(reduced fee)
2025/8/7New fee schedule effective from

Year 3 · Post-grant annuityRequired600 BRL234 USD341 USD300 BRL234 USD287 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 4 · Post-grant annuityRequired600 BRL234 USD341 USD300 BRL234 USD287 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 5 · Post-grant annuityRequired600 BRL234 USD341 USD300 BRL234 USD287 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 6 · Post-grant annuityRequired600 BRL234 USD341 USD300 BRL234 USD287 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 7 · Post-grant annuityRequired960 BRL234 USD405 USD480 BRL234 USD319 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 8 · Post-grant annuityRequired960 BRL234 USD405 USD480 BRL234 USD319 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 9 · Post-grant annuityRequired960 BRL234 USD405 USD480 BRL234 USD319 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 10 · Post-grant annuityRequired960 BRL234 USD405 USD480 BRL234 USD319 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 11 · Post-grant annuityRequired1,320 BRL234 USD469 USD660 BRL234 USD351 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 12 · Post-grant annuityRequired1,320 BRL234 USD469 USD660 BRL234 USD351 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 13 · Post-grant annuityRequired1,320 BRL234 USD469 USD660 BRL234 USD351 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 14 · Post-grant annuityRequired1,320 BRL234 USD469 USD660 BRL234 USD351 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Year 15 · Post-grant annuityRequired1,320 BRL234 USD469 USD660 BRL234 USD351 USD
?

Standard feesPost-grant: annuity(Standard fee)
2025/8/7New fee schedule effective from

Reduced feesPost-grant: annuity(reduced fee)
2025/8/7New fee schedule effective from

Receipt time5–10 business days
Processing time2–3 years

Notes

1. After filing, Brazilian National Institute of Industrial Property (INPI) takes approximately 5-10 business daysissues the filing receipt;

2. Brazilutility modelFrom filing to grant takes approximately 2-3 years, The maximum term of protection is 15 years;

3. All timeframes above are subject to the authority’s actual examination progress; we make no guarantee regarding processing times.

Ready to discuss your patent filing?

Contact our team for filing strategy and document review.

Contact us
Preview and download the formatted quotation